Marble cladding work on the temple exterior and the installation of Rajasthani style sandstone window frames on the higher levels of the structure continues throughout various areas of the TOVP and will soon cover all sections of the temple, floor by floor.

E-mail me when people leave their comments –

You need to be a member of ISKCON Desire Tree | IDT to add comments!

Join ISKCON Desire Tree | IDT